Dorsey Lane Waterline Replacement

City of Tempe
Dorsey Lane (8th Street to University Drive), Tempe, Arizona
  • Waterline design
  • Utility coordination
  • Maricopa County of Environmental Services coordination
  • Post design services

This project included the design of over 1,200 linear feet of new 12-inch waterline and required that the existing waterline remain in place until all services could be tied over to the new line.

Entellus coordinated with utility companies to resolve all conflicts prior to construction and obtained Approval to Construct from Maricopa County Environmental Services Department (MCESD). Additionally, we helped the City navigate the State and City Historic Preservation Departments to allow a historic section of railroad and culturally-sensitive site to be excavated and relocated to ensure that the construction stayed on schedule.