Client
Location
Scope Of Work
- Project management
- Design reports
- Design and construction documents
- Engineer of Record Services
- Construction inspection
- Federal compliance
- Roadway design
- Water and sewer design
- Drainage analysis and design
- Private irrigation design
Project Leads
- Mike Speck, CPCConstruction Inspector
Gilbert Road is a primary north-south arterial in the City of Chandler. Entellus was retained to widen Gilbert Road to six lanes for five miles from Hunt Highway to Germann Road.

The design and construction was completed over several phases to align with local and federal funding. Along with the roadway improvements, the project also included water, sewer, and reclaimed water mains, drainage improvements, street lights, landscaping, and traffic signals. Our team coordinated with the City and utility companies to resolve utility conflicts and design relocations. We also assisted the City in the right-of-way acquisition process by identifying existing and proposed right-of-way, developing legal descriptions and exhibits, and meeting with property owners. We also provided construction administration services and assisted the contractor in coordination with the Roosevelt Water Conservation District for the construction of a box culvert to re-align their canal.